Specialist Project

Greenpeace

Aurora

2013

From concept design to out on the streets in 8 weeks, including 3d design and development, full engineering oversight and calculations, fabrication, sculpture, development of puppetry mechanisms, scenic finishing, and even including the rehearsal period. This was one bear-he-moth of a project fuelled by excitement, coffee, a very strong designer-fabricator working relationship and a massive absence of egos.

2 Iveco truck axles
2 tonnes of steel
8 weeks
15 operators
20 haulers
378 cups of coffee

https://www.youtube.com/watch?v=Kmqm0qSp-nA